The next day, Jason assembled the pantry and completed an assortment of odd jobs around the house. Then he decided he wanted to make a set of parallets out of PVC pipe. Back to Lowe's we went.
On the third day, after attempting to put his parallets together, Jason realized that we had miscalculated the number of end caps they required, which, in turn, required us to return to Lowe's. Three for three.
Hopefully we'll get our act together soon.
1 comment:
I can assure you that won't happen (cutting down the lowes trips). Sometimes jobs take me 5 homedepot trips. And Megan and I have spent many a "date night" browsing Home Depot for the weekends projects. good times. sort of.
Post a Comment